Supplier change

What should be checked after changing cap supplier?

Treat a closure supplier change as a packaging qualification event.

Direct answer

What should be checked after changing cap supplier?

After changing cap supplier, check the cap thread, liner or seal surface, grip area, material behaviour, feed orientation, cap height and removal-torque evidence against the approved pack. A cap that looks similar may still behave differently in the chute, on the thread or after storage.

Supplier-change qualification table

CheckWhy it mattersRecord
Thread fitControls how the cap starts and reaches final height.Approved sample comparison and fault photographs.
Liner or seal surfaceCan affect compression, leakage and later relaxation.Integrity test method and timing.
Cap surfaceAffects spindle-wheel grip and visible marking.Cap material, ribbing and damage check.
Feed behaviourDifferent moulding or weight can alter bowl, chute or elevator behaviour.Feed recovery and double-feed observations.

Related guidance

Continue the specification

FAT checklist

Plan evidence for sample testing, acceptance and handover.

Call now
01494 623015